The laying of a high-voltage (400 κV) underwater cable connecting the Peloponnese with the rest of the Greek mainland was completed on Monday, with the link tracing the Rio-Antirrio cable bridge.
The project is part of the Independent Power Transmission Operator's S.A. (ADMHE) overall plan to better connect Greece's grid, with the next major project being a connection of the mainland with the large island of Crete.